Are You A Pro? Join For Free

Saksarid Changtham

TKPV Explosive Co., Ltd.
Mining

Contact Information:

10260
TH

Years in Business:

 

14

Clients I'm Seeking:

 

Mining

About My Business:

 

Project ManagerEdit TKPV Explosive Co., Ltd. (Laos) Mining & Metals industry December 2009 – Present (1 year 6 months) Project Location: Ban Houayxai Gold-Silver Project, Saisomeboune Special Zone, Vientiane, Laos. Project Description: Sub contractor and supplier Blasting for Phu Bia Mining (PanAust) Responsibilities: -Blasting Works for Mining and Quarry from design pattern and initiation system, mark out pattern, charging, Tie in and firing by used several explosive material such as ANFO, Bulk Emulsion, Heavy ANFO, Emulsion Package, Pentolite Booster, Non-Electric Detonator (Nonel) for Production Bench Blasting, Boulder, Trench Blasting, Blasting For Construction, Presplit, Blasting Trim Shot on area have mix type of rock with various strength of rock for development and production works. -Supervise Blasting Work as Blast Controller, QA/QC for all blasting works. -Document Control, Cost Control, Quantity Surveyor all concern company duties. -Supervise all responsibilities for company as sub-contractor Blasting Work for mining and quarry development. -Quantities and consumption for all blasting activities. -Co-operate, repair and maintenance for Sandvik Mobile Crusher Plant for Jaw Crusher, Cone Crusher, VSI and mobile screening plant -Create Standard Operating Procedure, Safety Procedure, Job Safety Analysis, Risk Assessment for Drilling and Blasting Works. -Create Database for All work concern Drill and Blast to monitoring activities, progress and cost. Crusher and Quarry EngineerEdit Fattouch Industrial Holding Ltd. (South Sudan) Mining & Metals industry February 2009 – November 2009 (10 months) Project Location: No.30 May Avenue, Juba South Sudan Project Description: Produce Aggregate quarry rock (Granite), Construction & Erection for Parker Fix Plant such as Crusher Plant 500 Tons/Hours, Asphalt Plant, Batching Plant Project and Construction & Erection for Mobile Sand Screen Plant. Responsibilities: -Operate and Maintenance Parker Crusher Plant capacities 500 Tons/Hour, Supervise all quarry site such as blasting, development quarry. -Quantity Surveyor and Cost Control Duties to Monitoring for Planning, Activities, Downtime and Operating Hours, Quantity Production, Manpower for Crusher Plant. -Design, Estimate Supervise construction of Foundation for Parker’s Crusher plant 500 Tons/hours, Parker’s Asphalt plant 20 tons per hour, Parker’s Batching plant, Parker’s Sand Screen Plant -Erection works for Crusher plant installation. -Prepared & Process data for any survey works in this project. No recommendations for this position Ask for a recommendation Senior SurveyorEdit Bilfinger Berger Qatar W.L.L. (Qatar) Construction industry April 2008 – February 2009 (11 months) Project Location: Construction Of Barwa City Phase1 P.O. Box 23749, Doha, Qatar Project Description: Construction of Barwa City Project, 128 Apartment Blocks, a 5,968 apartment Residential Project, which all works initiating from design to finish, including all The infrastructure of the new city therefore such as Storm Water Pipe, Foul Water Pipe, TSE Pipe, Chilled Water Pipe, Portable Water Pipe, Electric Cable and Gas Pipe. Responsibilities: -Lead surveyor for the14 teams on site construction for Civil Work and Infrastructure Work. -Lias with the clients representative, Maunsell Consulting on a day to day Basis for the quality control checks according to QA/QC quality control procedures. -Training the site supervisors and foremen in construction sequence with major Reference to speed and quality of works. Chief Supervisor QA/QC – Survey Musandam Rock LLC (Oman) Mining & Metals industry October 2006 – March 2008 (1 year 6 months) Project Location: Al Hala Main Road-Khasab, Musandam, Sultanate of Oman Project Description: Armor Rock Quarry Project (average production 10,000 Tons/day) Responsibilities: -Testing quality of rocks and prepare documents for approval of the client. -Quantity Surveyor, Cost Control Works and Database Programming by Visual Basic in Microsoft Access for Monitoring production quantities Blasting Cost, Fuel & Oil Consumption for Dry Equipment and Floating Equipment, Manpower and Equipment Hours and verification of unit cost for Production. -Supervise all works in quarry site such as earth work, construction road go up to mountain, cutting slope, prepare bench for production bench blasting, Blasting work (ANFO with Electric Detonator), loading Armor Rock to barge. -Survey Design and AutoCAD Operator for surveying work and drawing plan. -Survey for construction to install crusher plant, screen plant, belt conveyor and tunnel for transport aggregate to the barge for development quarry to produce aggregate and sand. -Shop Drawing for crushing plant installation and construction work in Quarry. -Selection and sizing of Armor Rocks by visual check in 5 categories as Category 1 300-1,000kg Category2 500-2,000kg Category3 1,000-3,000kg Category 4 2,000- 5,000kg Category5 3,000-7,000kg. Managing Director (Own Business)Edit Ban♦Gullayagasorn Co., Ltd.(Thailand) Construction industry August 2004 – September 2006 (2 years 2 months) Project Location: North Region, South Region, West Region of Thailand. Project Description: -Sub contractor for construction the Civil Work and Grounding and Lighting Protection System (Height Steel Structure Tower 45-70 meters) Telecommunications Infrastructure Project for Mobile network System (AIS CENTRAL REGION WEST PROJECT GSM PHASE 14C, TA- ORANGE PROJECT PHASE 4.3, AIS-CENTRAL REGION NORTH PROJECT PHASE 15C, CDMA PHASE 2000X) Those project for build The Mobile telephone network sub station (Distribution Station, Repeat Signal Station) around Thailand. -Sub contractor for construction around Thailand. Responsibilities: -Estimate, Planning schedule for time, material, manpower. -Tracking the progress and cost relation. -Auto CAD operates for Shop Drawing for construction, As Built for handover to the client. -Supervise all of construction work in the site .Assign the plan and instruction to Staffs in the site such as superintendent, site engineer and foreman. -Clerical work for all document relate such in construction contract, Invoice, Tax Invoice -Survey for construction and Survey inspection. Assistant Quarry ManagerEdit SNC♦Lavalin International Inc. (Libya) Construction industry August 2003 – June 2004 (11 months) Project Location: The Great Man Made River Project, This project is biggest pipeline network of the world (Sarir Pre Stressed Concrete Cylinder Pipe Manufacturing Plant Contract 61915-A-510-00-CT-CT-0001). Sarir Libya Project Description: Main Manufacturing located at Sarir Plants the biggest manufacturing plant to Produce the PCCP pipes of the world which the production lines could be spread in to 5 lines of product with over 2,000 manpower and over 500 of equipment used. The project is produce spread pipe for replacement of damaged pipes in the Great Man Made River Project, Libya. Quarry Department to produce the coarse aggregate (Ø 10-19 mm.) of 600-1,100 tons/day, fine aggregate (Ø 3-10 mm.) of 1,200-2,000 tons/day, coarse sand (Ø 0-5 mm.) of 2,500-3,000 tons/day and fine sand (Ø 0-3 mm.) of 2,500-3,000 Responsibilities: -Quantity Surveyor works to Monitoring for quantity involved in the material, consumable, the tools, the manpower, the production of the aggregate and all cost inside the quarry department, then prepare a system for data entry easily readable and exhaustive for the cost control department by Visual Basic in Microsoft Access for relation between the production and the cost. -Surveying Works for Quantity Check, Land surveying and Mapping of the survey data recorded by the survey crew for survey design, Survey for Construction, Traverse for monument point refers to monument of Libya Surveying Department, Convert survey point from Radar Survey point (Geographic Coordinate) to UTM Coordinate (WGS84) -Radar surveying for investigation aggregate source in the Sahara Desert. Layout plan from radar surveying for assign Master schedule Planning, Place the aggregate source and setup reference point. Assign layout plan for quarry by Dynamic GPS. Assign service road and place of Pre-Screening Plant. -Assist the Quarry Manager for all the clerical work. Cost Control & QA/QC Technician (and as acting Civil Engineer)Edit SNC♦Lavalin International Inc.(Libya) Construction industry June 2002 – July 2003 (1 year 2 months) Project Location: The Great Man Made River Project This project is biggest pipeline network of the world (Repair Works For the Sarir – Sirt and Tazerbo–Benghazi, Pre Stressed Concrete Cylinder Pipe Lines). Contract184, Ajdabiya Libya. Project Description: That Project to repaired (Post-tensioning) and replacement pipe line diameter 4 meters of lines pipe from Tazerbo to Benghazi and Sarir to Sirt about 300 Kilometers. This project replaces 4000 pipes and repairs (Post-tensioning) 500 pipes, using a fleet of over 400 employees from 5 nationalities (Thai, Canadian, Romanian, French, Libyan) 200 heavy equipments and 100 vehicles. Responsibilities: -Cost control of project budget & directly report to Projects Control Director -Build Database assign for cost control for whole set of project follow policy from Projects Control Director. -Quantity Surveyor for Quantity Checking & Progress Report, Schedule and Planning Report. - Material Laboratory e.g. Soil, Concrete etc. - Investigation and Monitoring the As Built Drawing for handover to the Libya Government. - Preliminary Surveying Construction drawing plan for new project (Tripoli Ring Road Project) to get the authorization from Libya Government. Foreman ConstructionEdit VLC & M Co., Ltd. (Thailand) Now This company is Areeya Properties (Public) Co., Ltd. Construction industry July 2000 – May 2002 (1 year 11 months) Projects Descriptions: -Katthaleeya Home Real Estate Project, area of project 20 Rai. or 32,000 Sqr. meters and 40 units of houses. -Real Estate Home Project Buengkum Bangkapi and Suvinthavong ,Ladkabang (Region of Bangkok ,Capital of Thailand) including area of 230 raise or 368,000 square meters -Project of re-made path of Bangkok World Bank Loan -2ndSanam-Luang (National Park) Project (Budget of project 10 million Thai Baht) -Construction Sub-Road Sub-Road Annex83, Sub-Road Annex85, Sub-Road Annex87 length 350 meter and Sub-Road Ruamjai Pathana for 350 meter. Responsibilities: -Estimate Cost Of Project, Cost of variation order from customer -Planning for Master Schedule, Material Schedule. -Primary Survey to issue Topographic Map calculated quantity of material to estimate cost. -Shop Drawing, prepared the Drawing Plan to request construction license from government. -Supervise construction of all of work in the site. -Survey Design to assign Infrastructure Alignment, Land Used, Landscape of project that could be match with architecture layout plan and land survey to received the deed from government, mapped the property for real estate projects. Land Surveyor (Temporary & Part Time Officer)Edit Dermbangnangbourch Land office(Thailand) Construction industry December 1999 – July 2000 (8 months) Company: Dermbangnangbourch Land office(Thailand), Department of Lands, Ministry of Interior, Supanburi Province. Projects Descriptions: Department of lands is an institute where responsible issuing a title deed real estate is gives with people, and all transactions that about the real estate. Responsibilities: -Transformed, deed mapping sketch and land survey documentation from 29 Origins to be UTM. System. -Investigated & Surveying and Mapping for Cadastral land’s bounder to device the property in issuing the deed. Survey EngineerEdit Private Land Surveyor Official Kred - Petch Surveying & Mapping Co., Ltd.(Thailand) Mining & Metals industry January 1999 – April 2000 (1 year 4 months) Company: Private Land Surveyor Official Kred - Petch Surveying & Mapping Co., Ltd.(Thailand) Supanburi Province. (Private Land Surveyor Official was received License by Department Of Lands, Ministry of the Interior) Projects Descriptions: Private Land Surveyor Official is an institute where is responsible land surveying does a map and issue a title deed the real estate give with people. Moreover This company is contractor for any survey project in Thailand. Responsibilities: -Performed primary mapping for telephone line in distributing service of Telephone Organization of Thailand. -Presentation Topographic mapping to operate the landscape of Agriculture Researching Institute of Southeast Asia Co.,Ltd. -Investigated & Surveying and Mapping for Cadastral land’s bounder to device the property in issuing the deed. Foreman BuildingEdit Skanchai Company Limited (Thailand) Construction industry October 1997 – December 1998 (1 year 3 months) Projects Descriptions: Nakvatchalautid Hospital (Bangkok Hospital Center 48).This hospital is permanent community hospital with 60 beds structure reinforced concrete building. Responsibilities: -Supervise all of construction work in the site. -As Built plan for handover to the client. -Survey for construction such as locates position of station, place construction line, Grid line, Structure line, Finishing Line, elevation for construction work required. Foreman (Between Studies in University)Edit Suankasatreanthai Partnership Company Limited(Thailand) Construction industry February 1996 – September 1997 (1 year 8 months) Projects Descriptions: Suankasatreanthai Real Estate project. This project has all areas 1000 Rai or 1,600,000 a square meter That is oval large-sized project composes club art building like Thai originally style, the road within the project late a pillar is 12 reinforced wide meter length 1 kilometer concretes , the road supports 10 wide 16 length total kilometer meters. Responsibilities: -Estimate cost of Project, Planning such as Master Schedule, Material and Manpower Schedule. -Supervise all of construction work in the site. -Primary Survey to issue Topographic Map calculated quantity of material to estimate cost and land survey for received the deed from government, Survey Design to assign Infrastructure Alignment, Land Used, and Landscape of project that could be match with architecture layout plan, Survey for construction such as locates position of station, place construction line, Grid line, Structure line, Finishing Line, elevation for construction work required. Edumine and Golder Associates Edit Professional Development and Training for Mining, Blast Design and Assessment for Surface Mines and Quarries 2011 – 2011 (expected) This is a practical course that provides a review of blasting theory and blasting products, and emphasizes the design, assessment and optimization of blasting practices. The course focuses on drilling and blasting as it is applied in surface mines and quarries. Design methodology for safe and efficient blasting is provided. Monitoring and assessment to improve blast performance and reduce blast vibrations are discussed and examples of optimization programs are provided to illustrate the process. Topics are presented in an applied manner and address the impact of blasting on mine design and overall mining efficiency. Activities and Societies: Topics covered by the course include: Explosives and Charging Systems, Initiating Devices and Systems, Production Bench Blasting, Overbreak Control and Secondary Blasting, Damage Control, Safety and Accident Prevention. Sandvik Manufacture England, Sandvik Mining And Construction (UK) Edit Training Course, Technical Training Heavy Range Sandvik Mobile Crusher 2010 – 2010 Activities and Societies: Operate, Repairing and Maintenance for Mobile Sandvik Mobile Crusher Heavy Range, Electric System and Hydraulic System. Management Trainer: Sanvik Heavy Range Mobile Crusher Manufacture England, Sandvik Mining And Construction (UK) Completed Date: 28 October 2010 Sandvik Manufacture Northern Ireland, Sandvik Mining And Construction (UK) Edit Training Course, Training Middle Range Sandvik Mobile Crusher 2010 – 2010 Activities and Societies: Subject: Operate Repairing and Maintenance for Mobile Sandvik Mobile Crusher Middle Range, Electric System and Hydraulic System. Management Trainer: Sanvik Middle Range Mobile Crusher Manufacture Northern Ireland, Sandvik Mining And Construction (UK) Completed Date: 21 October 2010 Chulalongkorn Mahawitthayalai Edit Training Course, Digital Photogrammetry Survey 2004 – 2004 Activities and Societies: Basic of Digital Photogrammetry Survey, Digital Photogrammetry Processing, Geometry of Digital Photogrammetry, Photo Control Point, Digital Elevation Model (DEM), Digital Surface Model (DSM) and Geographic Information System (GIS). Mahawithayalai Rangsit Edit Bachelor’s Degree in Civil Engineering, Civil Engineering 1991 – 1998

Company:
Expertise:
Location:
Years in business:
Member since:
Clients I'm looking for:
Bio: